COED Y BRENIN ADAM & EVE
Contract to design new trail section Adam & Eve part of the MBR trail system.
A highly constrained site both ecologically and physically. Client required a modern highly featured, fast flowing, descending section, with a series of jumps and technical trail features, to replace a section of trail that conflicted with other walking paths and user groups.
This section featured berms, table tops, hips, ski jump and a series of large flowing hipped rollers which were a trail design first.
We also carried out the design supervision and CDM-C role during the construction phase.