PROJECT MANAGEMENT SERVICES

Coed Y Brenin Adam & Eve MTB Trail Design

Contract to design new trail section Adam & Eve part of the MBR trail system.

Screen Shot 2017-11-15 at 11.15.17.png

COED Y BRENIN ADAM & EVE

Contract to design new trail section Adam & Eve part of the MBR trail system. 

A highly constrained site both ecologically and physically. Client required a modern highly featured, fast flowing, descending section, with a series of jumps and technical trail features, to replace a section of trail that conflicted with other walking paths and user groups.

This section featured berms, table tops, hips, ski jump and a series of large flowing hipped rollers which were a trail design first.

We also carried out the design supervision and CDM-C role during the construction phase.

Screen Shot 2017-11-15 at 10.44.58.png
Screen Shot 2017-11-16 at 12.49.54.png
 
Screen Shot 2017-11-15 at 11.13.34.png